Orders Date | Subject | Orders Remarks |
---|---|---|
07 Mar, 2019 |
In the matter of Chhotanagpur Rope Works Pvt. Ltd. CP (IB) No. 1035-KB-2018 ![]() |
WITHDRAWN |
07 Mar, 2019 |
In the matter of Samaara Leathers Pvt. Ltd. IBA-140-IB-2019 ![]() |
WITHDRAWN |
07 Mar, 2019 |
In the matter of Orris Infrastructure Pvt. Ltd. (IB)-1663(PB)-2018 ![]() |
WITHDRAWN |
07 Mar, 2019 |
In the matter of Lakshya Realinfra Pvt. Ltd. (IB)-03(PB)-2019 ![]() |
WITHDRAWN |
07 Mar, 2019 |
In the matter of Orris Infrastructure Pvt. Ltd. (IB)-24(PB)-2019 ![]() |
WITHDRAWN |
07 Mar, 2019 |
In the matter of Orris Infrastructure Pvt. Ltd. (IB)-234(PB)-2019 ![]() |
WITHDRAWN |
07 Mar, 2019 |
In the matter of Orris Infrastructure Pvt. Ltd. (IB)-1012(PB)-2018 ![]() |
WITHDRAWN |
07 Mar, 2019 |
In the matter of Benaka Sponge Iron Private Limited C.P. (IB) No. 166-BB-2018 ![]() |
ADMITTED |
07 Mar, 2019 |
In the matter of TSN Ecotech International Private Limited MA-6-IB-2019 in CP-302-IB-CB-2018 ![]() |
LIQUIDATION |
07 Mar, 2019 |
In the matter of Photon Energy System Limited I.A. No. 160-2019 in CP (IB) No. 231-9-HDB-2018
![]() |
SETTLED |